{"id":5010,"date":"2017-07-25T12:16:15","date_gmt":"2017-07-25T10:16:15","guid":{"rendered":"http:\/\/neu.volzconsulting.de\/?page_id=5010"},"modified":"2017-12-29T19:39:13","modified_gmt":"2017-12-29T18:39:13","slug":"lean-management","status":"publish","type":"page","link":"https:\/\/volzconsulting.de\/en\/verkehrswegebau\/lean-management\/","title":{"rendered":"Lean Management"},"content":{"rendered":"<p><\/p>\n<div class=\"custom-linespace-header\">\n<h1 class=\"custom-linespace\">LEAN MANAGEMENT<\/h1>\n<h3 class=\"custom-linespace\">Understanding, analysing, visualising and optimising processes.<\/h3>\n<\/div>\n<div class=\"custom-linespace-header custom-bottom-space\">\n<div class=\"custom-linespace custom-bottom-space-35\">To ensure competitiveness it won&#8217;t suffice to compromise between cycle time, cost and quality. Lean Management offers new possibilities to increase performance. Process optimisation represents change. Leaving worn paths requires courage to question the current work flow. It is not only about improving individual processes and to improve quality. Rather a holistic approach that is now necessary in many sectors. It is no less than a different and better value chain. Lean Management includes all methods, mindsets and tools to optimise processes and to meet client requirements without unnecessary waste. This is guaranteed with a systematic, multi level process.<\/div>\n<\/div>\n<div><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-5342 size-large alignleft\" src=\"https:\/\/volzconsulting.de\/wp-content\/uploads\/2017\/11\/Grafik_Zieldefinition_PP_EN.png\" alt=\"\" width=\"1024\" height=\"228\" \/><\/div>\n<div id=\"liste\" class=\"custom-linespace-header\">\n<div class=\"txt-img\">\n<h3 class=\"custom-linespace\">Flow Principle<\/h3>\n<div class=\"custom-linespace\">The Flow Principle ensures that every production factor needed, like resources or information, can be used unhindered during production or in a project. This guarantees that production or the project does not stall. Ist the production or the project &#8220;in flow&#8221;, a continuous growth in value of the product or the project forms.<\/div>\n<\/div>\n<\/div>\n<div id=\"liste\" class=\"custom-linespace-header\">\n<div class=\"txt-img\">\n<h3 class=\"custom-linespace\">Takt Principle<\/h3>\n<div class=\"custom-linespace\">One cycle represents: &#8220;The realistion of even capacity and even operating speed of a project&#8221;. On top of that the supply of material for example happens in the rhythm of the project or the construction measure. The clock becomes the heartbeat of the projects and idle time as well as peak loads are avoided.<\/div>\n<\/div>\n<\/div>\n<div id=\"liste\" class=\"custom-linespace-header\">\n<div class=\"txt-img\">\n<h3 class=\"custom-linespace\">Pull-Principle<\/h3>\n<div class=\"custom-linespace\">Based on the Pull Principle information and process components are pulled into the project at the intended point of time where they are processes. In contrast the Push Principle represents pushing information and project components from one step to the next. The Push Principle pays little attention to taking running projects or task structures into consideration.<\/div>\n<\/div>\n<\/div>\n<div id=\"liste\" class=\"custom-linespace-header\">\n<div class=\"txt-img\">\n<h3 class=\"custom-linespace\">No Mistake Principle<\/h3>\n<div class=\"custom-linespace\">The reason for this principle is clear &#8211; mistakes that identified later lead to higher waste that identifying mistakes immediately. Because of that a production or construction measure is structured and optimised to detect mistakes at the earliest possible time and to fix it. Avoiding mistakes minimises rework &#8211; changes in planning are reduced, transparency rises and the workload drops noticeably.<\/div>\n<\/div>\n<\/div>\n<div id=\"liste\" class=\"custom-linespace-header\">\n<div class=\"txt-img\">\n<h3 class=\"custom-linespace\">Visualisation<\/h3>\n<div class=\"custom-linespace\">Visualisation is the base of every adjustment, because only with a consistent visualisation improvements can happen elsewhere. Abstract data and coherencies are put into a graphical or visually ascertainable form. A clear visualisation has the goal to ideally pool exchanging experiences as well as knowledge in the project or the company.<\/div>\n<\/div>\n<\/div>\n<div id=\"liste\" class=\"custom-linespace-header\">\n<div class=\"txt-img\">\n<h3 class=\"custom-linespace\">Shop-Floor-Management<\/h3>\n<div class=\"custom-linespace\">The Shop-Floor-Management\u00a0primarily supports the continuous development of processes and sequences on site. A consistent information basis for example is as defining for success as directed communication of different topics. With a oriented communication landscape it is clearly organised which information gets communicated and how discrepancies need to be taken care of.<\/div>\n<\/div>\n<\/div>\n<div class=\"section-full-width section-dark custom-margin-top-50\" style=\"background-color:#252525;\" id=\"section-2\"><div class=\"section-boxed\" style=\"color:#ffffff;\"><\/p>\n<div class=\"custom-linespace-header\">\n<h1 class=\"custom-linespace custom-margin-top-50\">LEAN MANAGEMENT for the construction industry<\/h1>\n<h3 class=\"custom-linespace\">The successful transformation to a lean construction company<\/h3>\n<\/div>\n<div class=\"custom-linespace-header\">\n<div class=\"custom-linespace\">The Volz Consulting GmbH, with their experience, successfully transfers the Lean Management Principles to the construction industry. The Japanese management philosophy forms the core component, avoiding waste and continuously improving processes.<\/div>\n<div class=\"custom-linespace custom-margin-top-10\">\nIt does not make a difference whether companies specialised themselves on asphalt paving, canalisation or rail construction, milling or other trades. On the basis of your core competency a target process is identified and tested on performance, then adjusted and implemented throughout the company.<\/div>\n<div class=\"custom-linespace custom-margin-top-10\">Our focus is on the staff. We put great value on developing and implementing solutions together.<\/div>\n<div class=\"custom-linespace custom-margin-top-10\">In order to achieve this all involved in the project are taken into consideration. Therefore the acceptance and implementation speed rise significantly. The result is a sustainable competitive advantage that cannot be copied.<\/div>\n<\/div>\n<p>\n<\/div><\/div>\n<p>\n<div class=\"content-slider-wrapper\" >\n    <div class=\"content-slider cols-wrapper cols-2\" id=\"content-slider-5010-1\" >\n        <div class=\"section-boxed\">\n            <ul id=\"cs-slider-ul\" style=\"min-height:290px;\">\n                \n                    <li data-bg_image_url=\"\" data-bg_image_opacity=\"1\" data-layout=\"centered\" data-animation=\"slideLeft\" data-bg_color=\"FFFFF\" class=\"cs-layout-centered\" style=\"color:#000000;\">\n\n                        <!-- first slider box -->\n                        <div class=\"cs-content-centered col cs-content\">\n                            <p class=\"cs-element\" ><div class=\"cs-element cs-animate\"><div class=\"personalZitat\"><div class=\"zitat\"><div class=\"vc-spacer\"><\/div><div class=\"vc-float-left\"><i class=\"vc vc-quote-left vc-50px\"><\/i><\/div><div class=\"vc-float-right\"><i class=\"vc vc-quote-right vc-50px\"><\/i><\/div><p>The consulting was highly professional and kind.<\/p><\/div><\/div><div class=\"zitatFooter\">\r\nMarkus Maier, Materials Management<br class=\"clear\" \/>\r\n<\/div>\r\n<\/div><\/p>\n                                <p class=\"clear\"><\/p>\n\n                                                    <\/div>\n                        <!-- second slider box -->\n\n                                                <\/li>\n                    <li data-bg_image_url=\"\" data-bg_image_opacity=\"1\" data-layout=\"centered\" data-animation=\"slideLeft\" data-bg_color=\"FFFFF\" class=\"cs-layout-centered\" style=\"color:#000000;\">\n\n                        <!-- first slider box -->\n                        <div class=\"cs-content-centered col cs-content\">\n                            <p class=\"cs-element\" ><div class=\"cs-element cs-animate\"><div class=\"personalZitat\"><div class=\"zitat\"><div class=\"vc-spacer\"><\/div><div class=\"vc-float-left\"><i class=\"vc vc-quote-left vc-50px\"><\/i><\/div><div class=\"vc-float-right\"><i class=\"vc vc-quote-right vc-50px\"><\/i><\/div><p>Unbelievable - how much potential BPO sets free!<\/p><\/div><\/div><div class=\"zitatFooter\">\r\nSina Tibeus, Executive Assistant<br class=\"clear\" \/>\r\n<\/div>\r\n<\/div><\/p>\n                                <p class=\"clear\"><\/p>\n\n                                                    <\/div>\n                        <!-- second slider box -->\n\n                                                <\/li>\n                    <li data-bg_image_url=\"\" data-bg_image_opacity=\"1\" data-layout=\"centered\" data-animation=\"random\" data-bg_color=\"FFFFF\" class=\"cs-layout-centered\" style=\"color:#000000;\">\n\n                        <!-- first slider box -->\n                        <div class=\"cs-content-centered col cs-content\">\n                            <p class=\"cs-element\" ><div class=\"cs-element cs-animate\"><div class=\"personalZitat\"><div class=\"zitat\"><div class=\"vc-spacer\"><\/div><div class=\"vc-float-left\"><i class=\"vc vc-quote-left vc-50px\"><\/i><\/div><div class=\"vc-float-right\"><i class=\"vc vc-quote-right vc-50px\"><\/i><\/div><p>Ideal results!<\/p><\/div><\/div><div class=\"zitatFooter\">\r\nMarkus Beckmann, Member of Resources Management<br class=\"clear\" \/>\r\n<\/div>\r\n<\/div><\/p>\n                                <p class=\"clear\"><\/p>\n\n                                                    <\/div>\n                        <!-- second slider box -->\n\n                                                <\/li>\n                    <li data-bg_image_url=\"\" data-bg_image_opacity=\"1\" data-layout=\"centered\" data-animation=\"random\" data-bg_color=\"FFFFF\" class=\"cs-layout-centered\" style=\"color:#000000;\">\n\n                        <!-- first slider box -->\n                        <div class=\"cs-content-centered col cs-content\">\n                            <p class=\"cs-element\" ><div class=\"cs-element cs-animate\"><div class=\"personalZitat\"><div class=\"zitat\"><div class=\"vc-spacer\"><\/div><div class=\"vc-float-left\"><i class=\"vc vc-quote-left vc-50px\"><\/i><\/div><div class=\"vc-float-right\"><i class=\"vc vc-quote-right vc-50px\"><\/i><\/div><p>The unitary information basis alone allowed so much progress for us \u2013 I am excited for more!<\/p><\/div><\/div><div class=\"zitatFooter\">\r\nJulius Hoffstadler, Construction Manager<br class=\"clear\" \/>\r\n<\/div>\r\n<\/div><\/p>\n                                <p class=\"clear\"><\/p>\n\n                                                    <\/div>\n                        <!-- second slider box -->\n\n                                                <\/li>            <\/ul>\n        <\/div>\n    <\/div>\n<\/div><div class=\"clear\"><\/div><\/p>","protected":false},"excerpt":{"rendered":"<p>LEAN MANAGEMENT Understanding, analysing, visualising and optimising processes. To ensure competitiveness it won&#8217;t suffice to compromise between cycle time, cost [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":0,"parent":4967,"menu_order":4,"comment_status":"closed","ping_status":"closed","template":"template-full-custom.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-5010","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/volzconsulting.de\/en\/wp-json\/wp\/v2\/pages\/5010"}],"collection":[{"href":"https:\/\/volzconsulting.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/volzconsulting.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/volzconsulting.de\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/volzconsulting.de\/en\/wp-json\/wp\/v2\/comments?post=5010"}],"version-history":[{"count":69,"href":"https:\/\/volzconsulting.de\/en\/wp-json\/wp\/v2\/pages\/5010\/revisions"}],"predecessor-version":[{"id":8187,"href":"https:\/\/volzconsulting.de\/en\/wp-json\/wp\/v2\/pages\/5010\/revisions\/8187"}],"up":[{"embeddable":true,"href":"https:\/\/volzconsulting.de\/en\/wp-json\/wp\/v2\/pages\/4967"}],"wp:attachment":[{"href":"https:\/\/volzconsulting.de\/en\/wp-json\/wp\/v2\/media?parent=5010"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}